State OKs Funds for Reinforcing 5 Freeway Bridges
- Share via
The California Transportation Commission has approved spending $2.6 million to upgrade five bridges along the Long Beach Freeway (710).
One project, estimated to cost $2.07 million, will strengthen a box-girder bridge over the Los Angeles River in South Gate and a steel-girder bridge over the Hobart rail yard in Vernon and Commerce. The work involves adding steel reinforcement to bridge supports. Once completed, the spans will be able to accommodate the extra-heavy loads that are occasionally hauled on state highways under special permit.
A second project, estimated to cost $671,000, will upgrade railings on three bridges where the Long Beach Freeway crosses the Santa Ana Freeway (5) in Commerce. The new railings will be made of concrete reinforced with steel rods and will stand 32 inches high.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.